:: Training Aids: AV Materials

Shopping Cart

Roughneck Training - Part 2: Laying Down Pipe (DVD)

Price: $110.00
Catalog No. 65.0521

ordering instructions

Roughneck Training Series Part 2

Roughneck Training Series Part II: Laying Down Pipe

After total depth has been reached, roughnecks must pull out and lay down the pipe. Rigging down and moving the rig should be done with as much care as drilling. All the equipment will be used on another job, so it is important that roughnecks do their job right. This video shows how drill pipe and drill collars should be laid down, inspected, and prepared for transport to the next location. 1983, 11 minutes, comes with a workbook.

To purchase additional workbooks or instructor’s guides, please contact PETEX sales.