:: Training Aids: AV Materials

Shopping Cart

Roughneck Training -  Part 2: Laying Down Pipe (Workbook Only)

Roughneck Training Series (DVD) series, Part 2

Price: $10.00
Catalog No. 65.0521W
Also Available:

  • Roughneck Training - Part 2: Laying Down Pipe (DVD)
  • ordering instructions

    Roughneck Training Series Part II: Laying Down Pipe - Workbook

    After total depth has been reached, roughnecks must pull out and lay down the pipe. Rigging down and moving the rig should be done with as much care as drilling. All the equipment will be used on another job, so it is important that roughnecks do their job right. This video shows how drill pipe and drill collars should be laid down, inspected, and prepared for transport to the next location. 1983.

    Customers Also Bought:

    Don’t Forget the Essentials!