:: Training Aids: AV Materials

Roughneck Training - Part 2: Laying Down Pipe (Workbook Only)
Roughneck Training Series (DVD) series, Part 2Price: $10.00
Catalog No. 65.0521W
Also Available:
Roughneck Training Series Part II: Laying Down Pipe - Workbook
After total depth has been reached, roughnecks must pull out and lay down the pipe. Rigging down and moving the rig should be done with as much care as drilling. All the equipment will be used on another job, so it is important that roughnecks do their job right. This video shows how drill pipe and drill collars should be laid down, inspected, and prepared for transport to the next location. 1983.
Customers Also Bought:
- The Rotary Rig and Its Components (Pub)
- So You Want to Be a Roughneck? (AV)
- Elementary Drilling (Course)
Don’t Forget the Essentials!
