RESOLVED: UPS 308 maintenance is concluded & will reconvene at 6:00 PM on 4-9-2013.

Service Restored

At 00:34 UPS is online. Closing maintenance window.


Maintenance is being extended until 1 AM.


Maintenance is starting.


Repair work on UPS 308 was aborted at 1:00 am on April 9th.
Further investigation into the root cause of UPS 308 switching to bypass will continue today starting at 6:00 pm and running until 10:00 pm - once the condition is corrected, the system will be restored to normal operation.  This is not expected to have any impact on connected systems.  This issue will remain open until that time – with no further updates until investigation is completed.


UPS 308 has been placed in utility mode & maintenance has concluded. The ITS Facilities team will reconvene at 6:00 PM on 4-9-2013 to continue repairs.


Secondary boards are being installed & calibrated. Maintenance is being extended to 01:30 AM & will not exceed further. Service will be back on utility at that time.


Board calibrations are in process.  Maintenance is being extended to 12 AM.


Maintenance is being extended to 11pm.


Maintenance starting.


Further investigation into the root cause of UPS 308 switching to bypass will continue today starting at 6:00 pm and running until 10:00 pm - once the condition is corrected, the system will be restored to normal operation.  This is not expected to have any impact on connected systems. 

This issue will remain open until that time – with no further updates until investigation is completed.


While investigating an issue this morning with the UPS that supports NOC-A, the UPS switched into bypass mode at 11:10 a.m., which takes the UPS out of the loop and everything downstream is fed by the UPS’s available source. Several machines in the NOC saw a power drop and many transferred to their other power supply or source or rode out the drop until power returned.  There were several systems impacted briefly.  ITS is in the process of completing its investigation and identifying the root cause. There is 1 p.m. call with the necessary parties to determine the best time to take the machine out of bypass and return to UPS protected power (likely late this evening).  A follow on notification will be made when that maintenance is scheduled.


At approximately 11:15, UPS 308 switched into bypass onto it’s available power input.  There was a momentary power drop that has affected some machines in the NOC-A data hall.  UDC, Network, and OTS teams are investigating to determine the impact.

 

 

Last updated on Apr 10, 2013 12:43 AM