Change Log: Change Management Guidelines
This document lists significant changes that have been made to the Change Management Guidelines.
| Date | Change description | Original text |
|---|---|---|
| 10/1/2009 | Updated visual appearance to new template. Corrected any out of date links to ensure they are pointing to the most current policy documents. | |
| 9/14/2007 | Changed references from BPM 53 to UTS 165. | "BPM 53" |
| 6/27/2007 | Removed from section III, "Planning the Change" the list item "Can the maintenance be performed within the standard maintenance window?" because of redundancy. Changed "a" to "the" in "Can the change be made within the standard maintenance window?" |
"Can the maintenance be performed within the standard maintenance window? " "Can the change be made within a standard maintenance window?" |

