12CSP015 - JCD - AHU 5W & 7W Replacement

Project Summary

The abbreviated Summary of Work is as follows:

AHU 5W & 7W Replacement

Removal and replacement of two (2) existing air handling units (AC-5W & AC-7W) located in the basement of Jester Dormitory with two new units AHU -5W and AHU-7W and one new outside air pretreatment unit OAU-7W. Mechanical work includes Demo and installation of equipment and ductwork in the mechanical room.  DDC controls for the AHU’s. Electrical work includes demo of existing electrical for wiring of new starters for the new AHU’s and VFDs for AHU -5W, AHU-7W and OAU-7W. Life Safety requires the installation of smoke detectors in the supply and return ducts.

Base Bid is to provide a fully operational HVAC system including equipment, related electrical, sheet metal, piping, etc.  Time Schedule is based on the equipment being on site by June 11, 2012 and installation operational with beneficial use by August 3, 2012.

The Contractor shall be responsible for disassembling and re-assembling the equipment as required for ingress into the mechanical room. Equipment may be shipped in multiple sections depending on best container method as determined by the manufacturer.

Phasing will be required to minimize down time for respective zones on the chilled water system.

Demo and replace chilled water and hot water piping and add new piping and control valves. Provide DDC control of the chilled water control valve and temperature sensor for each AHU.

Install Return air smoke detectors on floors G – 8.    

The general Construction Budget for the project is approximately:

 $2,565,000.00 to $2,907,000.00

Project Site

Jester Dormitory (JCD)

Map of Brackenridge Hall Dormatory

Key Dates:

  • Pre-Proposal Conference Site: FC1 1.118B
  • Pre-Proposal Conference Date: February 2, 2012 Time: 1:30 P.M.
  • Notice to Proposers Out: January 25, 2012
  • Specifications and Plans Available on or about: January 27, 2012
  • Envelopes #1 Date: February 16, 2012 Time: 1:30 P.M.
  • Envelope #2 and # 3 and Public Response Acknowledgement Date: February 17, 2012 Time: 1:30 P.M.
    (All proposal envelope openings held at FC1, Room 2.102. See map below.)
  • No. of Addenda: 1

PMCS Offices:

Map to PMCS Offices

Directions to PMCS:

FC1 - Facilities Complex Building 1, 1301 E. Dean Keeton, Austin (Corner of Dean Keeton and Lafayette St.)

From the South: Take the Manor Rd. exit and continue north through the light passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the second driveway, turn right.

From the North: Take the Manor Rd exit. Turn left at Manor Rd. then left again onto the frontage road. Continue north, passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the 2nd driveway, turn right.