12CSP027 - PHR - Chilled Water Pump Replacement

Project Summary

The abbreviated Summary of Work is as follows:

Chilled Water Pump Replacement: Except as otherwise expressly provided herein, the Contractor shall supply all adequate and competent labor, supervision, tools,  equipment, installed and consumable materials, services, testing devices, warehousing and each and every item of expense necessary for the design, engineering, supply, fabrication, field erection, applications,  handling, hauling, unloading, receiving, installation, construction, assembly, testing, evaluation and quality assurance of the University of Texas at Austin, Pharmacy Building Chilled Water Pump Replacement hereinafter called the Work.  The word ‘provide’ used in this specification section shall refer to the Work and shall mean all the above activities. 

Timeliness:  The burden of timeliness in the complete cycle of submittal data, shop drawings and sample processing is on the Contractor.  The Contractor shall allow a minimum of two (2) weeks time frame for review of each submission.  The Contractor is responsible for allowing sufficient time in the construction schedule to cover the aforementioned cycles of data processing, including time for all re submittal cycles on unacceptable materials, equipment, etc. covered by the data submit  Construction delays and/or lack of timeliness in the above regard are the responsibility of the Contractor and will not be considered in any request for scheduled construction time extensions and/or additional costs to the Owner.                                   

The general Construction Budget for the project is approximately: $175,000.00 to $199,000.00.

Project Site

Pharmacy Building (PHR)

Map of Brackenridge Hall Dormatory

Key Dates:

  • Pre-Proposal Conference Site: FC1 1.118B Conference Room
  • Pre-Proposal Conference Date: August 6, 2012 Time: 8:30 A.M.
  • Notice to Proposers Out: July 31, 2012
  • Specifications and Plans Available on or about: August 2, 2012
  • Envelope #1 Date: August 21, 2012 Time: 11:30 A.M.
  • Envelopes #2 and # 3 and Public Response Acknowledgement Date: August 22, 2012 Time: 11:30 A.M.
    (All proposal envelope openings held at FC1, Room 2.102. See map below.)
  • No. of Addenda: 1

PMCS Offices:

Map to PMCS Offices

Directions to PMCS:

FC1 - Facilities Complex Building 1, 1301 E. Dean Keeton, Austin (Corner of Dean Keeton and Lafayette St.)

From the South: Take the Manor Rd. exit and continue north through the light passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the second driveway, turn right.

From the North: Take the Manor Rd exit. Turn left at Manor Rd. then left again onto the frontage road. Continue north, passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the 2nd driveway, turn right.