The University of Texas at Austin
Contact Us | For Staff

12CSP031 - RSC - Lighting Replacement

Project Summary

The abbreviated Summary of Work is as follows:

Lighting Replacement: Replace existing metal halide lighting with fluorescent lighting in the three contiguous gymnasiums.       

The general Construction Budget for the project is approximately: $270,000.00 to $306,000.00.

Project Site

Recreational Sports Center (RSC)

Map of Brackenridge Hall Dormatory

Key Dates:

  • Pre-Proposal Conference Site: FC1 2.106 Large Conference Room
  • Pre-Proposal Conference Date: August 31, 2012 Time: 9:00 A.M.
  • Notice to Proposers Out: August 27, 2012
  • Specifications and Plans Available on or about: August 29, 2012
  • Envelope #1 Date: September 18, 2012 Time: 1:30 P.M.
  • Envelopes #2 and # 3 and Public Response Acknowledgement Date: September 19, 2012 Time: 1:30 P.M.
    (All proposal envelope openings held at FC1, Room 2.102. See map below.)
  • No. of Addenda: 1

PMCS Offices:

Map to PMCS Offices

Directions to PMCS:

FC1 - Facilities Complex Building 1, 1301 E. Dean Keeton, Austin (Corner of Dean Keeton and Lafayette St.)

From the South: Take the Manor Rd. exit and continue north through the light passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the second driveway, turn right.

From the North: Take the Manor Rd exit. Turn left at Manor Rd. then left again onto the frontage road. Continue north, passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the 2nd driveway, turn right.