13CSP001 - BUR - 3rd - 6th Floor Wet-Pipe Sprinkler

Project Summary

The abbreviated Summary of Work is as follows:

3rd - 6th Floor Wet-Pipe Sprinklers: Burdine Hall (BUR) is currently partially sprinklered (floors 1& 2).  The scope of this work is to install new wet pipe sprinkler systems throughout the remainder of the building including floors 3, 4, 5, & 6 in order to create a fully sprinklered building compliant with NFPA 13.  The existing standpipe on in stair three will be extended through to the 6th floor, new sprinkler floor control assemblies will be installed on floors 3-6 and new flow and tamper switches will be tied into the existing fire alarm panel.   

The general Construction Budget for the project is approximately: $315,000.00 to $357,000.00.

Project Site

Burdine Hall (BUR)

Map of Brackenridge Hall Dormatory

Key Dates:

  • Pre-Proposal Conference Site: FC1 2.106 Large Conference Room
  • Pre-Proposal Conference Date: September 20, 2012 Time: 2:00 P.M.
  • Notice to Proposers Out: September 13, 2012
  • Specifications and Plans Available on or about: September 18, 2012
  • Envelope #1 Date: October 10, 2012 Time: 11:30 A.M.
  • Envelopes #2 and # 3 and Public Response Acknowledgement Date: October 11, 2012 Time: 11:30 A.M.
    (All proposal envelope openings held at FC1, Room 2.102. See map below.)
  • No. of Addenda: 1

PMCS Offices:

Map to PMCS Offices

Directions to PMCS:

FC1 - Facilities Complex Building 1, 1301 E. Dean Keeton, Austin (Corner of Dean Keeton and Lafayette St.)

From the South: Take the Manor Rd. exit and continue north through the light passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the second driveway, turn right.

From the North: Take the Manor Rd exit. Turn left at Manor Rd. then left again onto the frontage road. Continue north, passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the 2nd driveway, turn right.