13CSP019 - BRK - HVAC and Building Renovations (Phase 8)

Project Summary

The abbreviated Summary of Work is as follows:

HVAC and Building Renovations (Phase 8): Construct Shed-type enclosures at each of five apartment buildings to house twenty-one new split system air conditioning systems. Install sheet metal ductwork distributed above new ceiling areas to be provided inside each apartment unit.  Paint exteriors of five buildings including new mechanical sheds. Repair and paint trim, and install gutters and downspouts where shown.  Replace kitchen counters, sinks and cabinetry in twenty-one apartment units, and replace bathroom and hallway cabinetry, countertops, lavatories and water closets.  In three of the apartment units, provide ADA upgrades including replacement of bathtubs with showers. Provide handicap accessibility upgrades at parking and sidewalk areas outside of designated apartment buildings. 

The general Construction Budget for the project is approximately: $720,000.00 to $816,000.00.

Project Site

Brackenridge Apartments (BRK)

Key Dates:

  • Pre-Proposal Conference Site: FC1 1.118B Conference Room
  • Pre-Proposal Conference Date: June 13, 2013, 2013 Time: 9:00 A.M.
  • Notice to Proposers Out: June 6, 2013
  • Specifications and Plans Available on or about: June 11, 2013
  • Envelope #1 Date: June 27, 2013 Time: 11:00 A.M.
  • Envelopes #2 and # 3 and Public Response Acknowledgement Date: June 28, 2013 Time: 11:00 A.M.
    (All proposal envelope openings held at FC1, Room 2.102. See map below.)
  • No. of Addenda: 1

PMCS Offices:

Map to PMCS Offices

Directions to PMCS:

FC1 - Facilities Complex Building 1, 1301 E. Dean Keeton, Austin (Corner of Dean Keeton and Lafayette St.)

From the South: Take the Manor Rd. exit and continue north through the light passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the second driveway, turn right.

From the North: Take the Manor Rd exit. Turn left at Manor Rd. then left again onto the frontage road. Continue north, passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the 2nd driveway, turn right.