The University of Texas at Austin
Contact Us | For Staff

13CSP021 - UNB - Redesign Student Events Center Suite 4.312

Project Summary

The abbreviated Summary of Work is as follows:

Redesign Student Events Center Suite 4.312: Renovation of the north portion of the fourth floor consisting of open lounge and office spaces in an existing building. The work shall consist of demolition, metal stud framing, concrete, drywall, plaster, interior finish carpentry, wood-veneer-faced architectural cabinets, applied fireproofing, hollow metal doors and frames, flush wood doors, door hardware, tile, carpeting, painting, toilet compartments, roller window shades, plumbing, HVAC, electrical power, lighting, fire alarm and fire sprinkler.   

The general Construction Budget for the project is approximately: $473,000.00 to $536,000.00.

Project Site

Union Building (UNB)

Map of Harry Ransom Center

Key Dates:

  • Pre-Proposal Conference Site: FC1 1.118C Conference Room
  • Pre-Proposal Conference Date: September 3, 2013 Time: 8:30 A.M.
  • Notice to Proposers Out: August 27, 2013
  • Specifications and Plans Available on or about: August 29, 2013
  • Envelope #1 Date: September 17, 2013 Time: 2:30 P.M.
  • Envelopes #2 and # 3 and Public Response Acknowledgement Date: September 18, 2013 Time: 2:30 P.M.
    (All proposal envelope openings held at FC1, Room 2.102. See map below.)
  • No. of Addenda: 1

PMCS Offices:

Map to PMCS Offices

Directions to PMCS:

FC1 - Facilities Complex Building 1, 1301 E. Dean Keeton, Austin (Corner of Dean Keeton and Lafayette St.)

From the South: Take the Manor Rd. exit and continue north through the light passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the second driveway, turn right.

From the North: Take the Manor Rd exit. Turn left at Manor Rd. then left again onto the frontage road. Continue north, passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the 2nd driveway, turn right.