Project Summary

The abbreviated Summary of Work is as follows:

This project includes the renovation Cleanroom 1.304 suite in the Micro Electronics Research (MER) building on the Pickle Research Center campus in Austin, Texas. The total area of the project is approximately 4,000 square feet. The two existing Class 100 clean rooms in that area will remain in operation during the construction of this project and they will be extended into the lab room space at the back of the building. The adjacent wet labs 1.402 and 1.406 will be gutted and converted to four Class 100 clean rooms with utility service corridors between each one. The new clean rooms will be constructed in a similar fashion to the existing clean rooms with similar materials for wall, ceiling, and floor surfaces. Due to limited plenum space, the new clean rooms will be equipped with ceiling mounted modular fan-filter HEPA units and chilled water fan coil units for cooling. Existing process utilities will be used to serve the equipment in the clean rooms. The existing process exhaust, general exhaust, and make-up air have adequate capacity and will be used to serve the new clean room spaces. The existing loading dock 1.004 will be equipped with tightly sealing doors to maintain the adjacent clean room classification. A new exterior loading dock and dock leveler will be constructed adjacent to the existing loading ramp on the west side of the building south of the clean rooms. CMR will coordinate the activities of the Owner’s Commissioning agent.

 

The general Construction Budget for the project is approximately: $2,700,000.00 to $3,060,000.00.

Project Site

Pickle Research Campus (PRC), (Microelectric & Engineering Resource Center - MER)

WPR

Key Dates:

  • Notice to Proposers Out: June 4, 2014
  • Specifications and Plans Available on or about: June 6, 2014
  • Pre-Proposal Conference Site: PRC Bldg. 19 Conference Room
  • Pre-Proposal Conference Date: June 11, 2014 Time: 9:30 A.M.
  • Envelope #1 Date: June 26, 2014 Time: 10:30 A.M.
  • Envelope #2 and Public Response Acknowledgement Date: June 27, 2014 Time: 10:30 A.M.
    (All proposal envelope openings held at FC1, Room 2.102. See map below.)
  • No. of Addenda: 1

PMCS Offices:

Map to PMCS Offices

Directions to PMCS:

FC1 - Facilities Complex Building 1, 1301 E. Dean Keeton, Austin (Corner of Dean Keeton and Lafayette St.)

From the South: Take the Manor Rd. exit and continue north through the light passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the second driveway, turn right.

From the North: Take the Manor Rd exit. Turn left at Manor Rd. then left again onto the frontage road. Continue north, passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the 2nd driveway, turn right.