The University of Texas at Austin
Contact Us | For Staff

14CSP004 - JES - HVAC Renovation

Project Summary

The abbreviated Summary of Work is as follows:

HVAC Renovation: Replacement of existing Air Handling Units AC-1A, AC-2A, AC-3A, AC-8A, chilled water pumps and heating system.       

The general Construction Budget for the project is approximately: $2,282,000.00 to $2,586,000.00.

Project Site

Beauford H. Jester Center (JES)

Map of Harry Ransom Center

Key Dates:

  • Pre-Proposal Conference Site: FC1 1.118 Conference Room C
  • Pre-Proposal Conference Date: December 11, 2013 Time: 1:30 P.M.
  • Notice to Proposers Out: December 4, 2013
  • Specifications and Plans Available on or about: December 6, 2013
  • Envelope #1 Date: January 8, 2014 Time: 11:30 A.M.
  • Envelopes #2 and # 3 and Public Response Acknowledgement Date: January 9, 2014 Time: 11:30 A.M.
    (All proposal envelope openings held at FC1, Room 2.102. See map below.)
  • No. of Addenda: 1

PMCS Offices:

Map to PMCS Offices

Directions to PMCS:

FC1 - Facilities Complex Building 1, 1301 E. Dean Keeton, Austin (Corner of Dean Keeton and Lafayette St.)

From the South: Take the Manor Rd. exit and continue north through the light passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the second driveway, turn right.

From the North: Take the Manor Rd exit. Turn left at Manor Rd. then left again onto the frontage road. Continue north, passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the 2nd driveway, turn right.