14CSP013 - SSB - UHS - 2nd Floor Renovation

Project Summary

The abbreviated Summary of Work is as follows:

Renovation and reconfiguration on the 2nd floor of the Student Services Building (SSB) for UHS. Scope of work area is 24,864 sq. ft. and involves consolidation of the General Medicine A, B and C, the expansion and relocation of Allergy / Immunization, reconfiguration of the HITS and UHS Lab areas. A connecting stair between the 2nd floor General Medicine and 3rd floor women’s Health is being removed and in-filled with a new floor to be used by both areas. Work in the Administration area is limited to the area between them and new location of Allergy / Immunization.

The general Construction Budget for the project is approximately: $1,200,000.00 to $1,500,000.00.

Project Site

Student Services Building (SSB)

F. Loren Winship Drama Building

Key Dates:

  • Notice to Proposers Out: April 7, 2014
  • Specifications and Plans Available on or about: April 9, 2014
  • Pre-Proposal Conference Site: FC1 1.118 Conference Room C
  • Pre-Proposal Conference Date: April 14, 2014 Time: 9:30 A.M.
  • Envelope #1 Date: April 24, 2014 Time: 11:30 A.M.
  • Envelopes #2 and # 3 and Public Response Acknowledgement Date: April 25, 2014 Time: 11:30 A.M.
    (All proposal envelope openings held at FC1, Room 2.102. See map below.)
  • No. of Addenda: 1

PMCS Offices:

Map to PMCS Offices

Directions to PMCS:

FC1 - Facilities Complex Building 1, 1301 E. Dean Keeton, Austin (Corner of Dean Keeton and Lafayette St.)

From the South: Take the Manor Rd. exit and continue north through the light passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the second driveway, turn right.

From the North: Take the Manor Rd exit. Turn left at Manor Rd. then left again onto the frontage road. Continue north, passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the 2nd driveway, turn right.