Project Summary

The abbreviated Summary of Work is as follows:

Provide Job Order Contracting Services for Indefinite Delivery/Indefinite Quantity for Wayfinding Signage, Campus Wide, during the contract period of one year (with four (4) options allowing extensions). All projects under this solicitation will be considered “furnished & installed, “and will vary in quantity and size.

Separate work orders / job orders will be executed for each Wayfinding Signage project or use of service.  The work will be based on specific Job Orders which define the Work by Statement, Drawings and/or a Standardized Specification, negotiated by unit prices from a standardized Unit Price Guide (UPG), adjusted in cost by a Contractor’s coefficient and criteria described in the Proposal Documents.  Individual “Job Orders” for specific work performance projects shall be issued in indefinite quantities, for indefinite dollar amounts, for multiple trades and disciplines. Multiple Job Order Contracts could be awarded with a minimum dollar award of $15,000.00 per Contract per twelve (12) month period.  Each Contract awarded is ANTICIPATED for a maximum dollar amount of $500,000.00 per each Contract period.  Each Contract released will be considered for a Base Period and four (4) Option Periods.

The general Construction Budget for the project: Multiple Job Order Contracts could be awarded with a minimum dollar award of $15,000.00 per Contract per twelve (12) month period.  Each Contract awarded is ANTICIPATED for a maximum dollar amount of $500,000.00 per each Contract period.

Project Site

Main Campus (CAM)

Key Dates:

  • Notice to Proposers Out: April 11, 2014
  • Specifications and Plans Available on or about: April 16, 2014
  • Pre-Proposal Conference Site: FC1 1.118 Conference Room C
  • Pre-Proposal Conference Date: April 22, 2014 Time: 10:30 A.M.
  • Envelope #1 Date: May 5, 2014 Time: 11:30 A.M.
  • Envelopes #2 and # 3 and Public Response Acknowledgement Date: May 6, 2014 Time: 11:30 A.M.
    (All proposal envelope openings held at FC1, Room 2.102. See map below.)
  • No. of Addenda: 3

PMCS Offices:

Map to PMCS Offices

Directions to PMCS:

FC1 - Facilities Complex Building 1, 1301 E. Dean Keeton, Austin (Corner of Dean Keeton and Lafayette St.)

From the South: Take the Manor Rd. exit and continue north through the light passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the second driveway, turn right.

From the North: Take the Manor Rd exit. Turn left at Manor Rd. then left again onto the frontage road. Continue north, passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the 2nd driveway, turn right.