The University of Texas at Austin
Contact Us | For Staff
Home > Design & Construction Standards > Mechanical, Electrical, Plumbing & Fire Prevention

Mechanical, Electrical, Plumbing & Fire Prevention

Division 21: Fire Suppression

Section Title Origination Date Revision Date
21 00 01 Fire Sprinkler Systems 11/2007 02/2011
21 00 10 Standpipe Systems 11/2007 02/2011
21 20 00 Fire-Extinguishing Systems 11/2007 02/2011
21 30 00 Fire Pump/Jockey Pump 11/2007 02/2011
21 40 00 UT Jockey Pump Detail 02/2011  

 

Division 22: Plumbing

Section Title Origination Date Revision Date
01 00 00 General System Design 11/2007 04/2012
22 00 00 General Plumbing 11/2007 04/2012
22 05 00 Common Work Results for Plumbing 11/2007 04/2012
22 07 00 Plumbing Insulation 11/2007 04/2012
22 10 00 Plumbing Piping and Pumps 11/2007 04/2012
22 13 00 Facility Sanitary Sewerage 11/2007 04/2012
22 20 03 Water Recovery 11/2007 04/2012
22 40 00 Plumbing Fixtures 11/2007 04/2012
22 67 13.19 Laboratory and Deionized Water Systems 11/2007 04/2012

 

Division 23: Heating, Ventilating and Air Conditioning

Section Title Origination Date Revision Date
23 00 00 General Mechanical 11/2007 04/2012
23 05 00 Common Work Results for HVAC 11/2007 04/2012
23 07 00 HVAC Insulation 11/2007 04/2012
23 09 00 Instrumentation and Controls for HVAC 11/2007 04/2012
23 10 00 Facility Fuel Systems 11/2007  
23 20 00 HVAC Piping and Pumps 11/2007 04/2012
23 22 00 Steam and Condensate Piping and Pumps 11/2007 04/2012
23 31 00 HVAC Ducts 11/2007 04/2012
23 34 00 HVAC Fans 11/2007 04/2012
23 36 00 Air Terminal Units (VAV) 11/2007 04/2012
23 40 00 HVAC Air Cleaning Devices 11/2007 04/2012
23 50 00 Central Heating Equipment 11/2007 04/2012
23 60 00 Central Cooling Equipment 11/2007 04/2012
23 70 00 Central HVAC Equipment 11/2007 04/2012

 

Division 25: Integrated Automation

Section Title Origination Date Revision Date
25 05 00 Common Work Results for Integrated Automation 11/2007 04/2012
25 50 00 Integrated Automation Facility Controls (BAS) 11/2007 04/2012
25 55 00 Pneumatic Control Systems 11/2007 04/2012

 

Division 26: Electrical

Section Title Origination Date Revision Date
26 00 00 General Electrical 11/2007 09/2008
26 05 00 Common Work Results for Electrical 11/2007 04/2012
26 10 00 MV Electrical Transmission 11/2007 04/2012
26 20 00 LV Electrical Transmission 11/2007 04/2012
26 29 23 Variable Frequency Drives 11/2007 01/2008
26 30 00 Power Generating and Storing Equipment 11/2007  
26 50 00 Interior and Exterior Lighting 11/2007 04/2012
26 60 00 Electric Motors 11/2007 04/2012

 

Division 27: Distributed Communication Systems

Section Title Origination Date Revision Date
27 53 13 Clock and Bell System 11/2007 04/2012

 

Division 28: Electronic Safety and Security

Section Title Origination Date Revision Date
28 31 00 Fire Alarm and Signaling 11/2007 02/2011
28 31 90 Emergency Communication System Panel   08/13

 

Appendices

Section Title Origination Date Revision Date
6.01.01 Appendix N: Supplemental Material for Section 4.02 - Energy Model Assumptions 11/2007  
6.01.20 Appendix O: Supplemental Material for Section 4.02 - LCC Input Guide 11/2007  
6.01.21 Appendix P: Supplemental Material for Section 4.02 - LCC Template Report Form 11/2007  
6.01.22 Appendix Q: Supplemental Material for Section 4.02 - LCC Sample A 11/2007  
6.01.23 Appendix R: Supplemental Material for Section 4.02 - LCC Sample B 11/2007  
6.01.24 Appendix: Supplemental Material for Section 4.02 - LCC Sample C 11/2007  
6.01.25 Appendix: Supplemental Material for Section 4.02 - LCC Sample D 11/2007  
6.01.26 Appendix: Supplemental Material for Section 4.02 - LCC Sample E 11/2007  
6.01.27 Appendix: Supplemental Material for Section 4.02 - LCC Sample F 11/2007  
6.01.30 Appendix S: UT Standard CAD Details 11/2007  
6.01.40 Appendix T: Energy Impact Statement - Description 11/2007  
6.01.41 Appendix U: Energy Impact Statement - Sample 11/2007  
6.02.10 Appendix V: Pipe Testing Procedure 11/2007 09/2008
6.02.20 Appendix W: Water Recovery and Reuse 11/2007 01/2008
6.03.10 Appendix X: I - O Schedule 11/2007  
6.04.10 Appendix Y: Supplemental PSP Contract Document 11/2007  

 

Support Data for Life Cycle Cost

Section Title Origination Date Revision Date
Support Data for 5.21.00 (pdf) or (CAD) Appendix: UT-Jockey Pump NEW 09/2008  
Support Data for 6.01.22 Appendix: Supplemental Material for Section 4.02 - LCC Sample A 11/2007  
Support Data for 6.01.23 Appendix: Supplemental Material for Section 4.02 - LCC Sample B 11/2007  
Support Data for 6.01.24 Appendix: Supplemental Material for Section 4.02 - LCC Sample C 11/2007  
Support Data for 6.01.25 Appendix: Supplemental Material for Section 4.02 - LCC Sample D 11/2007  
Support Data for 6.01.26 Appendix: Supplemental Material for Section 4.02 - LCC Sample E 11/2007  
Support Data for 6.01.27 Appendix: Supplemental Material for Section 4.02 - LCC Sample F 11/2007  

Table of Contents