Biology Laboratories, 205 West 24th Street

Discovered on 4-21-03 at 11:30 a.m.

Graffiti: A black felt marker was used to draw an object on a concrete trashcan that was located on the northeast side of the building. Removal cost: $50.00.

Brazos Garage, 210 East Martin Luther King Blvd.

Occurred between 4-13-03 at 5:00 p.m. and 4-18-03 at 5:00 p.m.

Criminal Mischief: A circle approximately seven inches in diameter was partially cut into the right front window of a green 1998 Honda Accord that was parked on level 4. Repair cost: $200.00.

San Jacinto Residence Hall, 309 East 21st Street

Occurred between 4-18-03 at 12 noon and 4-19-03 at 10:00 a.m.

Criminal Mischief: An unknown instrument was used to damage the exterior portion of a key cylinder lock that was on a second floor south tower dormitory door. Repair cost: $30.00.

Sutton Hall, 210 West 21st Street

Discovered on 4-21-03 at 8:25 p.m.

Graffiti: Pink fingernail polish and blue ink were used to write some words on a wall in a 2nd floor women's restroom. Several colors of ink were used to write some words on a wall in a 2nd floor men's restroom. Removal cost: $100.00.

Union Building, #4 West Mall

Occurred between 4-18-03 at 12:01 a.m. and 4-22-03 at 12:30 a.m.

Criminal Mischief: A ceiling tile outside a women's restroom near the Underground was found broken. Replacement cost: $25.00.

Union Building, #4 West Mall

Occurred between 4-18-03 at 12:03 a.m. and 4-22-03 at 12:30 a.m.

Graffiti: A sharp instrument was used to etch a single letter into a wooden door that was located inside the men's restroom by the Cactus Caf. Repair cost: $100.00.

Union Building, #4 West Mall

Occurred on 4-22-03 between 12:05 a.m. and 12:30 a.m.

Graffiti: A sharp instrument was used to etch words onto a mirror that was located inside a 2nd floor men's restroom located on the north side of the building. Repair cost: $150.00.

Union Building, #4 West Mall

Occurred on 4-22-03 between 12:05 a.m. and 1:00 a.m.

Graffiti: A sharp instrument was used to etch two symbols onto a metal wall located inside a 4th floor men's restroom on the north side of the building. Repair cost: $100.00.